Search


Results 1-10 of 12 (Search time: 0.004 seconds).

Item hits:
Issue DateTitleAuthor(s)
1-Oct-2007A simulated model for cycle time reduction by acquiring optimal lot size in semiconductor manufacturingWang, Chia-Nan; Wang, Chih-Hong; 工業工程與管理學系; Department of Industrial Engineering and Management
2015資料中心結合軟體定義網路環境之網路應用程式效能瓶頸偵測林威勝; Lim, Wei-Sheng; 吳育松; Wu, Yu-Sung; 資訊科學與工程研究所
1-Jul-2007Resource allocation in network processors for network intrusion prevention systemsLin, Yi-Neng; Chang, Yao-Chung; Lin, Ying-Dar; Lai, Yuan-Chen; 資訊工程學系; Department of Computer Science
1-Feb-2004Scrapping small lots in a low-yield and high-price scenarioWu, MC; Chiou, CW; Hsu, HM; 工業工程與管理學系; Department of Industrial Engineering and Management
1911利用位能場做三維物體之路徑規劃Jou-Sin Lee; 莊仁輝; Jen-Hui Chuang; 資訊科學與工程研究所
1-Feb-1998The beta-assignment problemsChang, GJ; Ho, PH; 應用數學系; Department of Applied Mathematics
2003基於網路處理器架構之虛擬私人網路閘道器 : 實作與探討林權宏; Chiuan-Hung Lin; 林盈達; Ying-Dar Lin; 資訊科學與工程研究所
2012高速公路輔助標誌改變緩坡路段車流之研究李佳龍; LI, CHIA-LUNG; 吳宗修; Woo, T. Hugh; 運輸科技與管理學系
1998控片存貨水準之設定王明宏; Ming-Haung Wang; 李慶恩; Ching-En Lee; 工業工程與管理學系
2004以限制理論為基礎之工廠績效評估及派工法則何境峰; Ho Tseng-Fung; 李榮貴; Li Rong-Kwei; 工業工程與管理學系