Browsing by Author Yang, Dong-Yuh

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 1 to 20 of 20
Issue DateTitleAuthor(s)
1-Mar-2012ANALYTICAL METHOD FOR ACCURACY ANALYSIS OF THE RANDOMIZED T-POLICY QUEUEWang, Kuo-Hsiung; Yang, Dong-Yuh; Pearn, W. L.; 工業工程與管理學系; Department of Industrial Engineering and Management
17-Sep-2013Assessing Profitability of a Newsboy-Type Product with Normally Distributed Demand Based on Multiple SamplesSu, Rung-Hung; Yang, Dong-Yuh; Pearn, W. L.; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Aug-2011Comparative analysis of a randomized N-policy queue: An improved maximum entropy methodWang, Kuo-Hsiung; Yang, Dong-Yuh; Pearn, W. L.; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jun-2010Comparison of two randomized policy M/G/1 queues with second optional service, server breakdown and startupWang, Kuo-Hsiung; Yang, Dong-Yuh; Pearn, W. L.; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jul-2009Controlling arrivals for a queueing system with an unreliable server: Newton-Quasi methodWang, Kuo-Hsiung; Yang, Dong-Yuh; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Apr-2015Cost-minimization analysis of a working vacation queue with N-policy and server breakdownsYang, Dong-Yuh; Wu, Chia-Huang; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Mar-2011Decision-making in a single-period inventory environment with fuzzy demandSu, Rung-Hung; Yang, Dong-Yuh; Pearn, W. L.; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jan-1970Dynamic Control of a Machine Repair Problem with Switching Failure and Unreliable RepairmenWu, Chia-Huang; Yang, Dong-Yuh; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jan-2011Estimating Achievable Capacity Index based on Multiple SamplesWang, Tsung-Yin; Liou, Cheng-Hwai; Su, Rung-Hung; Yang, Dong-Yuh; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jun-2015Estimating and Testing Achievable Capacity Index with Exponentially Distributed DemandSu, Rung-Hung; Yang, Dong-Yuh; Pearn, W. L.; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jan-2009An Improved Approach for Estimating Product Performance Based on the Capability Index C(pmk)Pearn, W. L.; Yang, Dong-Yuh; Cheng, Ya-Ching; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jan-2009An Improved Approach for Estimating Product Performance Based on the Capability Index C-pmkPearn, W. L.; Yang, Dong-Yuh; Cheng, Ya-Ching; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jan-1970Modelling and optimisation of a two-server queue with multiple vacations and working breakdownsYang, Dong-Yuh; Chen, Yi-Hsuan; Wu, Chia-Huang; 工業工程與管理學系; Department of Industrial Engineering and Management
4-May-2015The multi-server retrial system with Bernoulli feedback and starting failuresYang, Dong-Yuh; Ke, Jau-Chuan; Wu, Chia-Huang; 工業工程與管理學系; Department of Industrial Engineering and Management
15-Nov-2009Optimal management of the machine repair problem with working vacation: Newton's methodWang, Kuo-Hsiung; Chen, Wei-Lun; Yang, Dong-Yuh; 工業工程與管理學系; Department of Industrial Engineering and Management
2008Optimal randomized control policy of an unreliable server system with second optional service and startupYang, Dong-Yuh; Wang, Kuo-Hsiung; Ke, Jau-Chuan; Pearn, Wen Lea; 工業工程與管理學系; Department of Industrial Engineering and Management
15-May-2010Optimization and sensitivity analysis of controlling arrivals in the queueing system with single working vacationYang, Dong-Yuh; Wang, Kuo-Hsiung; Wu, Chia-Huang; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Jan-1970Performance analysis and optimization of a retrial queue with working vacations and starting failuresYang, Dong-Yuh; Wu, Chia-Huang; 工業工程與管理學系; Department of Industrial Engineering and Management
1-Mar-2012Production yield measure for multiple characteristics processes based on S-pk(T) under multiple samplesPearn, W. L.; Yen, Ching-Ho; Yang, Dong-Yuh; 工業工程與管理學系; Department of Industrial Engineering and Management
2009具有第二次可選擇服務、服務者故障和啟動時間特徵之M/G/1排隊系統楊東育; Yang, Dong-Yuh; 彭文理; Pearn, W. L.; 工業工程與管理學系